Our Services

Specializing in All Phases of Tile & Stone.

Whether it's remodeling your entire home or a small project, we're here to help you every step of the way.

We work with a large variety of Tile, Laminate tile, Vinyl tile, Deco Tile, Ceramic, Porcelain, Wood Plank Tile, Natural Stone, Porcelain Slabs, Granite Slabs, Quarts Slabs, Quartzite Slabs, Engineered Stone slabs, Marble slabs, Glass tile, Mosaic Tile.

Process


MEASUREMENTS –
We’ll take square footage measurements of your project space(s) for the purpose of pricing the labor portion of your order and estimating total product need. This can be done via a free in-home consultation. With these measurements we’ll provide a proposal for the labor portion of your order, and estimated stone costs based on your likely range of choices.

MATERIAL SELECTION – You’ll select your slab(s) based on the estimated material requirements.

PROPOSAL FINALIZATION – Once you’ve made all of your material selections we’ll send you a revised proposal with all labor and material costs included. You’ll sign, date, and scan it back to us and we’ll process a deposit of either 10% or $500.00 whichever is less.  Deposits may be given via check or cash. We also accept electronic payments via Venmo or Zelle.

SINK, APPLIANCE, and FIXTURE SELECTION – Sinks, fixtures, and any appliances that will affect the countertop (such as a slide-in range or cooktop) must be on-site on the day of your countertop template, so you’ll need to select and purchase these ahead of time.

DEMOLITION and TEMPLATE: 1 DAY OF WORK – Except in the case of new cabinets, when this has already been done prior to cabinet installation, your plumbing will be completely disconnected in the project area(s) and your existing countertop will be demolished. Crews will then make a wood template of your project, which will be laid out on the stone you selected. The stone will be cut, polished, and finished with the edge detail of your choice.

COUNTERTOP INSTALLATION: 1-2 DAYS OF WORK - Your new stone countertop will be delivered, installed, and sealed. Undermount sinks will also be installed and holes will be drilled for fixtures.

PLUMBING RECONNECTION: 2-4 HOURS OF WORK, 1 DAY AFTER COUNTERTOP INSTALLATION – We allow the seal on the sink to dry for at least several hours, and sometimes overnight, before plumbing fixtures are installed and all plumbing is reconnected.

TILE BACKSPLASH INSTALLATION: 1-2 DAYS OF WORK - If you’ve selected a tile backsplash option, we’ll install, grout, and seal your new tile backsplash to complete your project.